This project successfully developed and delivered comprehensive concepts for utilizing water from 28 dams located in the western and southwestern regions of Saudi Arabia. Detailed designs, ready for tendering, were prepared for water utilization infrastructure.
The project began with a thorough as-is assessment of the existing situation. All dams were visited, data was collected, and water samples were taken wherever possible. The key criteria for water utilization included defining the quantity and quality of available water.