ADDC has directed Bunya to expedite the construction of Waterline DN800 mm Connecting TRANSCO DN1200mm in Umm Lafina Link Road (AD-27) to Regional DN 800mm in Abdullah Omran Taryam Road (Road E) including Revalidation of Integrated Hydraulic Study for the Entire Reem Island. Currently, the proposed route of DN800mm Waterline from Reem Hills is being reviewed by ADDC/TRANSCO.
Creating environments that inspire and endure, guided by decades of experience and a commitment to excellence.
Sheikh Hamdan Street
Al Masaood Tower, Suite 403
P.O. Box 47620
Abu Dhabi, UAE
COPYRIGHT © 2024 | KN INTERNATIONAL | ALL RIGHTS RESERVED