First Stage ASR Project in the Emirates of Dubai

Dubai

The Dubai Electricity and Water Authority (DEWA) initiated the Aquifer Storage & Recovery (ASR) project to ensure the supply of potable water during emergencies. Comprehensive groundwater studies conducted in the eastern parts of Dubai have identified suitable areas for ASR implementation. Based on the feasibility report, DEWA decided to begin with a small-scale Stage 1 project, which will provide detailed data to determine the optimal location for the full-scale ASR well field. Stage 1 of the ASR project was designed in a way that it can be fully integrated into a later industrial-scale project. 

Other Projects

Landscape Works for Zonescorp Main Center

Strategic Water Storage and Recovery Project

Higher Colleges of Technology