Strategic Tunnel Enhancement Programme (STEP) is a huge gravity-driven hydraulic
wastewater network tunnel currently being constructed by the Abu Dhabi Sewerage
Services Company (ADSSC). The project forms a crucial part of Plan Abu Dhabi 2030,
which is a comprehensive plan of developing Abu Dhabi to accommodate the increasing
population in the city, which is anticipated to reach three million by 2030.
Abu Dhabi Sewerage Services Company planned to discharge the generated sewerage
from Reem Island to the STEP Tunnel located in the Island Abu Dhabi, through Trunk
Sewer Link and a pumping station.
KN Intl. was awarded by the Abu Dhabi Sewerage Services Company (ADSSC) to plan,
design and supervised the construction of the link sewer project. Construction works
involve excavation using tunnel boring machines and casing of the tunnel with precast
concrete sections. The hydraulic tunnel and the access shafts are being lined with a
special membrane to protect the concrete sections. The tunnel is designed to last for
about 100 years.