Al Ain Poultry Farm is located at Al Yaher area in Al Ain Abu Dhabi road at approximate
distance of 25 kilometers from Al Ain.
The client wants to rehabilitate and upgrade the existing industrial waste water treatment
plant (WWTP) to reach 400 m3/d from 240 m3/d treated waste water.
KN Intl. reviewed the technical design prepared by the EPC Contractor in two stages
(concept and detailed design review).
The services provided include also construction supervision.